Zibo Linzi Hongda Mining Co., Ltd.

Zibo Linzi Hongda Mining Co., Ltd. is the first private mining enterprise in Zibo City. The mining area is located in Xianchuang District, Zibo City, Shandong Province, with a registered capital of 100 million yuan. With iron ore mining and processing as its main business, it is equipped with an ore dressing system of 1 million tons per year and an ore belt transportation system of 2 million tons per year.

In 2022, the company will have total assets of 1.206 billion yuan, produce 630,000 tons of iron concentrate, transport 2.2 million tons of ore, realize operating income of 682 million yuan, and net profit of 177 million yuan.

The company has accelerated the pace of intelligent mine construction, achieved reduction in staff and increased efficiency, improved production efficiency, and reduced the probability of disasters and accidents. At present, it is cooperating with Mining and Metallurgy Technology Group Co., Ltd. to implement the automation plan of belt transportation and mineral processing. At that time, it will be unattended, reduce production costs, improve anti-risk capabilities, and greatly increase economic benefits.

Focus on the front line

Linzi Hongda Mining Co., Ltd. carried out emergency drill for evacuation in severe disastrous weather
In order to effectively do a good job in safety production management, enhance the staff's awareness of safety precautions and emergency response capabilities, and ensure that once an emergency occurs, it can effectively organize rapid response to minimi
2022.06.26    
Linzi Hongda Mining held the "Charity Day Donation" activity
In order to carry forward the traditional virtue of the Chinese nation of "solidarity and mutual assistance, and helping the needy", Linzi Hongda Mining, in combination with the activity plan of the Group and according to the actual situation, organized
2022.06.08    
Linzi Hongda Mining transferred Jinyi Mining personnel to the site smoothly
At present, the mining workshop of Linzi Hongda Mining has been filled to the level of - 220m, and all underground materials have been withdrawn, which has been lifted to the surface for filling. According to the current filling plan and actual situation,